AGS(HK) Technical Visit (2019) to Central Kowloon Route – Kai Tak West
Sat, 27 Jul
|Kai Tak West


Time & Location
27 Jul 2019, 9:00 am – 12:00 pm
Kai Tak West, 859X+MF, Hong Kong
About the event
Highlights :
In the project, dual 3-lane trunk road across central Kowloon is proposed linking the West Kowloon and the proposed Kai Tak Development (KTD) and connecting the West Kowloon Highway at Yau Ma Tei Interchange and the future Trunk Road T2 at KTD in order to fulfill the future need for traffic capacity across central Kowloon. Kai Tak West (KTW) is 1 of the 8 Contracts under the Central Kowloon Route (CKR). The main work of KTW includes the construction of tunnels under the seabed of Kowloon Bay and at Ma Tau Kok, and depressed roads and underpass at KTD.
In this visit, participants can have an opportunity to get a close up view on the geotechnical works in the project and discuss the construction method with the operation team.
Safety Requirements :
Participants should wear safety boot and bring their own safety hard hat and reflective vest. All…